Case studyBasra, Iraq
SIBA Field Development Project – Iraq
Siba Field Development Project
Basra, Iraq
Sectors
- Oil & Gas
Expertise
- Electrical
- Mechanical
- HVAC
Capabilities
- Engineering
- Procurement
- Construction
Clients
- PETROJET
Project Name
Siba Field Development Project
Location
Basra, Iraq
Project Owner
Kuwait Energy
Project Consultant
Kuwait Energy
Description
The Siba gas field, located in northern Iraq and explored in 1968, spans approximately 21 km in length and 6-13 km in width, with reserves of 1.1 trillion cubic feet. Petrojet secured the contract to construct the initial gas-processing facility for the field, designed to boost production to 3.1 million cubic meters per day.
Awarded Scope
Argonaut was tasked with supplying, installing, testing, and commissioning all HVAC system components, including:
- Air handling units and condensing units (9 units)
- Air cooling condensing units (9 units)
- Mini split high wall units (42 units)
- Supply/exhaust air fans (axial flow type)
- Air distribution system
- Sheet metal works
- Thermal insulation of sheet metal duct
- Air outlets
- Drainage system