Case studyAl-Ramadi, Iraq
Permanent Power Supply for FOB Ali, FOB Phoenix, and FOB Defender, Camp Ramadi
Permanent Power Supply for FOB Ali, FOB Phoenix, and FOB Defender, Camp Ramadi
Al-Ramadi, Iraq
Table of contents
Sectors
- Defense
Expertise
- Electrical
- Mechanical
Capabilities
- Engineering
- Procurement
- Construction
Clients
- AFCEE (Air Force Center for Engineering and the Environment)
Project Name
Permanent Power Supply for FOB Ali, FOB Phoenix, and FOB Defender, Camp Ramadi
Location
Al-Ramadi, Iraq
Client
AFCEE (Air Force Center for Engineering and the Environment)
Prime Contractor
ECC International, LLC
Contract Details
- Prime Contract: FA8903-06-d-8511
- Client Contract: S.C. # 4500.010-339183
Project Description
The scope encompassed "full range of methods and technologies supporting activities necessary to design and construct new facilities and infrastructure." The work supported construction for multiple units including:
- Headquarters for the 1st Infantry Bridge of the 7th Division of the New Iraqi Army
- 1st Battalion, 1st Brigade, 7th Division IA
- 2nd Battalion, 1st Brigade, 7th Division IA
- 3rd Battalion, 1st Mechanized Brigade, 7th Division IA
Argonaut's Scope
Argonaut handled all electrical generation and distribution infrastructure including generators, transformers, and switch gear installations for the three forward operating bases.
